This was a project to install a new treated timber bridge complete with treated timber abutments
and wingwalls superstructure. We were responsible for installing a bituminous wear surface on the bridge and approaches. Other elements of this project included installing riprap and 4 Type 3 object markers on timber guard posts. Erosion and pollution control systems were incorporated into the project to alleviate any runoff or contaminants from entering into waterways. Site Surveying and staking was conducted prior to any construction taking place.